Finishing Estimation Software [Neo Finishing] Case Study Tanaka Construction Co., Ltd.
Easy operation! A case where everyone in the construction department can master this system.
We would like to introduce a case study of Tanaka Construction Co., Ltd., which has implemented our finishing estimation software, Neo Finishing. The company was facing issues with time-consuming estimation processes, often resulting in overtime work, which became a burden. As a result, they considered implementing a system to shorten the estimation tasks. However, they needed a straightforward system that employees could continue to use without difficulty, rather than a complex one. As a result, everyone in the construction department was able to master the system, achieving a tenfold increase in efficiency for structural estimation and three to five times more efficiency for design estimation compared to traditional manual methods. **Case Overview** - Implementing Company: Tanaka Construction Co., Ltd. (Towada City, Aomori Prefecture) - Employee Size: Fewer than 10 to 50 employees - Implemented System: Neo Finishing *For more details, please refer to the PDF document or feel free to contact us.*
basic information
【Introduction Effects】 ■ Easy to operate, allowing everyone in the construction department to use it effectively ■ Significant reduction in estimation time ■ Tasks that previously required overtime or weekend work can now be completed within regular hours ■ Compared to traditional manual methods, efficiency has improved by 10 times for structural estimation and by 3 to 5 times for design estimation *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.