アザイ技術コンサルタント Official site

Excavation Method for Deposited Soil Suitable for the Removal of Accumulated Soil Around Bridge Piers

The patented excavation method for accumulated soil and sand is suitable for removing the accumulated soil and sand around bridge piers.

The sediment excavation method is suitable for the removal of accumulated sediment around bridge piers. 【Features】 ■ Can be implemented in confined spaces with a headroom restriction of 2.0m. ■ Capable of suctioning mud, sand, gravel, and cobblestones. (Grain size up to 15mm, transport distance of approximately 200m possible) ■ Structure designed to avoid obstacles such as driftwood and boulders. ■ Minimizes turbid water as much as possible. ■ Easy management of excavation depth. ■ Size of the dredging equipment can be adjusted according to site conditions. For more details, please download the materials or contact us.

Here is the HP of Azai Technology Consultant.

basic information

For more details, please download the materials or contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the materials or contact us.

Notice of temporary closure method due to pier reinforcement.

TECHNICAL

Distributors

Recommended products