アザイ技術コンサルタント Official site

[Patent Construction Method] "Temporary Closure FPS Method" to reduce underwater construction by divers.

The patented method, the temporary closure FPS method, is a construction technique that minimizes underwater work performed by divers.

The temporary deadline FPS method is a construction technique that minimizes underwater work performed by divers. It involves installing lifting fixtures and a floating work platform, assembling liner plates above water, and then lowering and installing them underwater. 【Features】 ■ Minimizes underwater construction. ■ Manual construction is possible. ■ Large-scale temporary structures are not required. ■ Construction and processes are reliable. For more details, please download the materials or contact us.

Here is the website for Azai Technology Consultants.

basic information

For more details, please download the materials or contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the materials or contact us.

Notice of temporary closure method due to pier reinforcement.

TECHNICAL

Distributors

Recommended products