アザイ技術コンサルタント Official site

Comparison with General Construction Methods: "Temporary Closure FPS Method"

The temporary waterproof sheet method is characterized by its ability to significantly reduce underwater construction by divers. We will cooperate in the design!

The temporary deadline FPS method has many advantages compared to conventional methods, including construction costs and timelines. Lifting fixtures and floating work platforms are installed, and the liner plates are assembled in the air before being lowered and installed underwater. 【Advantages】 ■ Manual construction is possible ■ Large-scale temporary structures are not required ■ Simple construction and processes, etc. 【Evaluation】 ■ Improved safety due to reduced underwater construction ■ Cost reduction For more details, please download the materials or contact us directly.

Here is the website for Azai Technology Consultants.

basic information

We handle temporary cutoff waterproof sheet methods, temporary cutoff FPS methods, special excavation pump dredging methods, and underwater investigation and surveying. Please feel free to contact us if you have any requests. Business Activities ■ Construction Consultant ■ General Civil Engineering ■ Marine Surveying

Price range

Delivery Time

Applications/Examples of results

For details, please download the materials or contact us directly.

Notice of temporary closure method due to pier reinforcement.

TECHNICAL

Distributors

Recommended products