[Stronger Method Adoption Example] Replacement of Bent Columns
The construction period is one day! The cost is less than half compared to base plate type or when demolishing and rebuilding.
Our company offers a rockfall protection fence reinforcement method called "Stronger Method," which allows for the reuse of bent posts by utilizing existing structures. First, remove the wire attachment fittings and cut the post at the base (250mm from the top). Then, attach the post connection member (only bolted). Next, install the raised post and reattach the removed wire attachment fittings. Compared to base plate systems or complete demolition and new installation, the cost is less than half, and the construction period can be completed in one day. [Example of Adoption] ■ Location: Yamanashi Prefecture ■ Type: Raised type ■ Work Procedure 1. Remove the wire attachment fittings and cut the post at the base (250mm from the top). 2. Attach the post connection member (only bolted). 3. Install the raised post and reattach the removed wire attachment fittings. *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Types of Stronger Method】 ■ Reinforcement Type: (E = 50→120kJ) ■ Elevation Type: (H = up to 3.5m) ■ Elevation Reinforcement Type: (E = 120kJ, H = up to 3.5m) *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Purpose】 ■ Reinforcement of rockfall protection fences *For more details, please refer to the PDF document or feel free to contact us.