Hyogo Prefecture Construction Case Study: Reinforcement Method for Existing Rockfall Protection Fences and Noise Control Measures During Demolition
This is a construction method that does not require measures for noise, dust, or high-alkali water treatment during concrete demolition.
Here is a case study of the "Stronger Method" implemented in Hyogo Prefecture. As a result of the construction, the fence height increased from 2.0m to 3.0m, with a construction length of L = 69.0m. This method does not require the use of small heavy machinery, so there is no need to cut down surrounding trees. Additionally, excavation of slopes and the use of concrete are not necessary during construction, allowing for the reuse of existing structures. 【Case Study】 ■ Raised type (Fence height: H = 2.0 → 3.0m, Construction length: L = 69.0m) ■ Hyogo Prefecture (Construction: Fiscal Year 2018) *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Method Features】 <Workability> ■ All components used in the Stronger method are factory-made, eliminating the need for processing work on site. ■ Installation of components does not require special tools or skilled workers. ■ Components are lightweight, making construction simple. *For more details, please refer to the PDF materials or feel free to contact us.
Price information
-
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.