Hyogo Prefecture Construction Case Study: Reinforcement Method for Existing Rockfall Protection Fences - No Special Tools or Skilled Workers Required
No special tools or skilled workers are required. Utilize the existing protective fence to "increase the height of the fence."
Here is a case study of the "Stronger Method" implemented in Hyogo Prefecture. As a result of the construction, the fence height increased from 2.0m to 3.0m, with a construction length of L = 36.0m. The installation of the components for this method does not require special tools or skilled workers. Additionally, all materials used are factory-made, eliminating the need for processing work on-site. [Case Study] ■ Raised type (Fence height: H = 2.0 → 3.0m, Construction length: L = 36.0m) ■ Hyogo Prefecture (Construction: Fiscal Year 2018) *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Construction Method Features】 <Environmental Aspects> ■ No need for excavation of slopes or use of concrete during construction, allowing for the reuse of existing structures. ■ There is no need to demolish existing concrete retaining walls, eliminating fire prevention measures associated with cutting support beams, as well as noise, dust, and high alkalinity water treatment measures during concrete demolition. ■ No need for small heavy machinery, which means surrounding trees do not need to be cut down. ■ Reduced impact on nearby residents, such as traffic restrictions. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.