Fukushima Prefecture construction case study: Reinforcement method for existing rockfall protection fences using a method that does not require new installation.
NETIS Registration Number HR-140004-A: Construction Case of Elevated Stronger Method
Here is an introduction to a construction case of the "Stronger Method" carried out in Fukushima Prefecture. As a result of the construction, the fence height increased from 1.5m to 2.5m. The construction length was L = 90.0m. This method allows for the existing rockfall protection fence to be utilized as is, enabling simple reinforcement and height increase without any special processing to the facility. 【Case Study】 ■Height Increase Type (Fence Height: H = 1.5 → 2.5m, Construction Length: L = 90.0m) ■Fukushima Prefecture (Construction: Fiscal Year 2018) *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Other Construction Examples】 ■Hyogo Prefecture ■Yamanashi Prefecture ■Shizuoka Prefecture ■Ministry of Land, Infrastructure, Transport and Tourism, etc. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.