Shizuoka Prefecture construction case study: Reinforcement method for existing rockfall protection fences; no need to fell surrounding trees.
Reduce the impact on nearby residents! There is no need to cut down surrounding trees as small machinery is not used.
Here is a case study of the "Stronger Method" implemented in Shizuoka Prefecture. As a result of the construction, the fence height increased from 2.0m to 3.0m, with a construction length of L = 18.4m. This method does not require special tools or skilled workers for the installation of components. Additionally, all materials used are factory-made, eliminating the need for processing work on-site. [Case Study] ■ Raised type (Fence height: H = 2.0 → 3.0m, Construction length: L = 18.4m) ■ Shizuoka Prefecture (Construction: Fiscal Year 30) *For more details, please refer to the PDF materials or feel free to contact us.
basic information
【Structural Overview: Components】 ■ Upper connection fittings (upper reinforcement frame) ■ Lower connection fittings (lower reinforcement frame) ■ Height-raising connection fittings ■ Upper restraint bar ■ Tensioning device ■ Wire diamond mesh *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.