日本ビソー Official site

Building exterior renewal, exterior wall renovation work [4. Aftercare]

We support preventive maintenance based on history.

■ Long-term maintenance and preservation with a forward-looking perspective To maintain the original functions of a building and to allow customers to use it for a longer period in greater comfort, appropriate maintenance and preservation are necessary. After a certain point, the rate of change in the exterior significantly increases, leading to more severe symptoms. We believe it is desirable to take appropriate measures before this point or at an early stage to ensure the long-term maintenance and preservation of the building. ■ Accumulation of information enables effective support Based on our extensive track record, we accurately grasp the current process of changes in the exterior of the targeted building and how it is expected to progress in the future. We propose maintenance and preservation methods that are more desirable for our customers. ■ Perspective on long-term preservation Regular inspections and planned adjustments or preventive maintenance are essential for a building. If areas that do not meet the required performance arise in part of the building, timely partial updates or reinforcements can delay the deterioration of the entire exterior. Furthermore, when overall deterioration of the exterior becomes apparent, implementing comprehensive renovations can ultimately reduce lifecycle costs and contribute to increased longevity.

Japan Biso - Exterior Renovation Work - 4. Aftercare

basic information

At Nippon Biso, we store reports and related documents regarding investigations and diagnoses related to renovation work for a long period of time. We also provide support for regular reports based on the Building Standards Act. - Regarding the review of the "Regular Reporting System" (Building Standards Act Articles 8 and 12) Exterior tiles, mortar, stone cladding We conduct tapping within reach and visual inspections for other areas, and if any abnormalities are found, or if it is the first inspection after 10 years from completion or exterior wall renovations, we will confirm areas that may pose a risk to pedestrians through comprehensive tapping, etc. (Amendment in April 2008) *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

【Purpose】Exterior construction work 【Sales Area】Metropolitan area

Exterior Construction Comprehensive Catalog

CATALOG

Distributors

Recommended products