Case Studies of Water Stop Board Introduction: Comprehensive Support from Design to Construction
Centralized management of cumbersome interactions! With an in-house design department and construction capabilities, we can respond quickly!
We would like to introduce a case study of our water barrier "Water Shutter." ~Q&A~ Q: I inquired about water barriers from other companies and requested a rough estimate, but there are additional construction costs besides the water barrier installation, and I am struggling to understand the actual costs involved. A: Our company provides full support from on-site surveys to product design and installation, so we can consistently present complicated details such as separate contractors for the installation and separate estimates for wall fabrication. 【Product Installation Overview】 ■ Product Details: H377 (2-panel) ■ Building: A certain factory office ■ Installation Location: Entrance, inside installation ■ Region: Shizuoka Prefecture *For more details, please download the PDF or feel free to contact us.
basic information
【Features】 ■ We have our own design department and also carry out construction, allowing for speedy responses. ■ Estimates can be provided as quickly as the same day. ■ If you have any questions regarding the installation of water stop boards, please feel free to consult us. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.