中央ビルト工業 Official site

  • OTHER

[Construction Industry News] Shinwa and three other companies jointly develop a bridge system scaffolding "Rapid Floor (TM)"

中央ビルト工業

中央ビルト工業

Contributing to the development and maintenance of social infrastructure with the latest type of suspended scaffolding that can be built easily, safely, and quickly. ◆Scheduled for market launch in 2024 On October 2, Shinwa Corporation, IHI Infrastructure Systems Co., Ltd. (hereinafter referred to as IIS), and Nikken Lease Co., Ltd. announced the joint development of the "Rapid Floor (TM)," a system scaffolding for bridges that ensures high strength, safety, and workability while also achieving labor savings. This scaffolding is aimed for market launch in 2024 and is planned to be used in new construction and repair work conducted by IIS. *For more information, please check the related product information below.