Construction Achievements: FY 2018, Fuchu City, Hiroshima Prefecture
Excellent durability against repeated loads such as earthquakes! Introducing our achievements in Fuchu City, Hiroshima Prefecture.
We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the bedrock due to weathering, while also dispersing the concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high effectiveness in preventing falling rocks. 【Construction Achievements】 ■Project Number: 3559 ■Client: Hiroshima Prefectural Eastern Construction Office ■Main Contractor: Amano Kiko Co., Ltd. ■Project Name: Fuchu Up and Down Line Road Disaster Prevention Work (Fuchihara Section) ■Prefecture: Hiroshima ■Construction Location: Kawamachi, Fuchu City ■Start Date: June 2018 ■End Date: September 2018 *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.