[Construction Achievements] H30 Hyogo Prefecture, Kanzaki District
Demonstrating high rockfall prevention effectiveness! Introducing the achievements in Kanzaki County, Hyogo Prefecture.
We would like to introduce the construction results of the DK Bond Method. The implementation of this method closes crack openings and prevents loosening of the bedrock due to weathering, while also dispersing concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high rockfall prevention effect. 【Construction Results】 ■ Client: Hyogo Prefectural Nakaharima Bureau ■ General Contractor: Tateiwa Co., Ltd. ■ Project Name: Landslide Countermeasure Work in the Nagase Area (Part 2) ■ Prefecture: Hyogo ■ Construction Location: Kamikawa Town, Kanzaki County ■ Construction Start: April 2018 ■ Construction End: December 2018 *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.