Construction Achievements: H30 Okayama Prefecture Kamisaibara
Applicable to giant rocks and high-altitude rocks! Introducing the achievements in Kamisaibara, Okayama Prefecture.
We would like to introduce the construction achievements of the DK Bond Method. The implementation of this method closes cracks and openings to prevent loosening of the bedrock due to weathering, while also dispersing concentrated stress in the area. This results in excellent durability against repeated loads such as earthquakes and demonstrates a high rockfall prevention effect. 【Construction Achievements】 ■ Project Number: 3579 ■ Client: Okayama Prefectural Mimasaka Bureau of Construction ■ General Contractor: Nakaniishi Kogyo Co., Ltd. ■ Project Name: 52-18-52 2-18-1 Public Road Construction (Slope Work) ■ Prefecture: Okayama ■ Construction Location: Kamisaihara, Kagamino Town, Tomata County ■ Construction Start Date: September 2018 ■ Construction End Date: November 2018 *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.