エルニード協会 Official site

Super Rappu Elniido Method - Shortening Construction Period! Ground Improvement Work

[NETIS Registration] Supporting the form of the earth with reliable technology! Appropriate and safe design tailored to the application.

We would like to introduce the features of the "Super Rappuru Erunido Method," which include shortened construction periods and high-quality embankments. By using different buckets according to soil types for mixing, it enables the creation of high-quality improved materials and also enhances efficiency. Additionally, the time from excavation to completion of embankment is short, and in most cases, direct excavation is possible, eliminating the need for excess excavation and the setting and removal of formwork. 【Features】 ■ Excellent cost-effectiveness ■ Easy confirmation of support layers ■ Minimal excess soil on site (remaining disposal soil volume) ■ Quick response to various sites *For more details, please download the PDF or feel free to contact us.

basic information

【Attachments for Use】 ■ Skeleton Mixing Bucket ■ M-Type Mixing Fork Bucket ■ In-House M-Type Mixing Fork Bucket ■ Drive Mixing Bucket ■ Original Mixing Bucket *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Related Videos

Super Rappuru Basic Construction Method (El Nido Method)

PRODUCT

Knead Soil Cement Method

PRODUCT

Slurry-type mechanical agitation block ground improvement method

PRODUCT

Foundation construction method using fluidized treatment soil: Super Rappu Elneed method.

PRODUCT

Super Rappu El Need Construction Method <Building Technology Performance Certificate>

OTHER

Elneed Method *NETIS Registration Document

OTHER

Distributors

Recommended products