エルニード協会 Official site

Super Rappu Elniido Method <Design, Construction, and Quality Control Guidelines>

[NETIS Registration] Foundation construction method using fluidized treatment soil! A comprehensive introduction for widespread adoption in buildings.

This document introduces the design, construction, and quality control guidelines for the Super Rappu Elniido method. It includes detailed information on the scope of application, terminology, symbols, the required performance of the embankment, design flowcharts, total load and allowable bearing capacity at the base of the embankment, and more. Additionally, it provides an overview and features of the method, making it a useful reference. Please feel free to download it and read through it. 【Contents (partial)】 ■ Chapter 1 General Provisions ■ Chapter 2 Design Policy ■ Chapter 3 Examination of Vertical Bearing Capacity at the Base of the Embankment ■ Chapter 4 Examination of Settlement ■ Chapter 5 Examination of Design Standard Strength of the Embankment ■ Chapter 6 Examination of Horizontal Resistance of the Embankment *For more details, please download the PDF or feel free to contact us.

Related Link - http://www.elknead.com/method/index.html

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Related Videos

Super Rappu El Nido Method <Design, Construction, and Quality Control Guidelines>

TECHNICAL

Elneed Method *NETIS Registration Document

OTHER

Distributors

Recommended products