エルニード協会 Official site

[Column] Comparison of Other Construction Methods and Processes / The Reason for the Significantly Faster Construction Time

Comparison of construction methods and processes / The reason why the construction time is overwhelmingly fast.

Can we achieve an overwhelming reduction in construction time? ⬛︎Explanation 1: No "slurry production" (compared to cement milk/pile improvement) In the cement milk method and pile improvement, the process begins with "slurry production," where cement and water are mixed at a batch plant. In fact, this preparation alone takes about 90 minutes for a site using 30 tons of cement. The Super Rappu Elneed method eliminates this entire preparation process. Since the solidifying agent is directly inserted in its package, there is no need for a plant or slurry production. The insertion work that took 90 minutes is completed in just 5 minutes. ⬛︎Explanation 2: No "formwork assembly and dismantling" (compared to the Rappu method) In the Rappu method, after "excavation," "formwork assembly" is performed, and after the concrete hardens, "formwork dismantling" occurs. These tasks require specialized craftsmen and are time-consuming processes. The Super Rappu Elneed method utilizes the sides of the excavation hole as a substitute for formwork (earthen formwork), eliminating the entire series of tasks related to "formwork." This allows for reductions in work time, labor costs, and material costs.

Related Link - https://el-knead.com/column/%e3%80%90%e4%bb%96%e5%…

basic information

For more details, please download the catalog or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the catalog or feel free to contact us.

Introduction to the Super Rappu El Need Method

PRODUCT

Introduction to the Super Rappuru Elniido Method (National Edition)

COMPANY

Distributors

The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.

Recommended products