エルニード協会 Official site

Foundation methods that achieve overwhelming construction period shortening for school building projects.

Achieved overwhelming reduction in construction time compared to other methods.

In school building construction, the construction period is a very important factor. Delays in the construction period not only increase construction costs but also affect the start date of education. Especially within a limited budget and schedule, efficient construction is required. The Super Rappeler Elneed method addresses these challenges by achieving a reduction in the construction period. 【Usage Scenarios】 * School building construction * Renovation of existing school buildings * Expansion of educational facilities 【Effects of Implementation】 * Significant reduction in construction period * Reduction in construction costs * Early start of education

[Comparison of Construction Methods and Processes] Why is the Super Lapel Elneed method "overwhelmingly faster in construction time"? Let's explain the comparison!

basic information

【Features】 * No need for slurry production * No need for formwork assembly or dismantling * Direct injection of curing agents * Utilization of the excavation hole sides as formwork 【Our Strengths】 The Elneed Association handles the Super Ruple Foundation Method (Elneed Method) and can respond to requests from across the country.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the catalog or feel free to contact us.

Method Manual - Technical Specifications

TECHNICAL

Method Manual: Cost Comparison and Basic Process Photos

PRICE

GBRC Performance Certification

OTHER

Elneed Method *NETIS Registration Document

OTHER

[Information] Super Rappuru El Nido Construction Method Construction History

TECHNICAL

Super Rappu El Nido Method <Design, Construction, and Quality Control Guidelines>

TECHNICAL

[Reference] Construction and Quality Control Guidelines for the Super Rappuru El Nido Method

TECHNICAL

Slurry-type mechanical agitation block ground improvement method

PRODUCT

Distributors

The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.

Recommended products