[Column] How to Prove the Quality of Ground Improvement? Three Stages of Quality Control

The quality of ground improvement that is not visible to the eye after construction. This introduces the concept of minimizing the discrepancy between test results and on-site strength through three stages of verification: before, during, and after construction.

"Is the strength as per the pre-test truly being achieved on-site?" Since the quality of ground improvement cannot be visually assessed after construction, many may struggle to explain it to clients and supervisors. ⬛︎ Three Factors of Strength Variation 1. Unexpected ground conditions (such as groundwater or cobbles) 2. Uniformity of mixing 3. Identification of the bearing layer To prove quality, it is necessary to confirm each of "mixing," "construction," and "ground." ⬛︎ Three Stages of Quality Confirmation Before construction: Use the soil with the lowest strength manifestation on-site and conduct compression tests at 3 and 7 days with three different mixing ratios to determine the mix. During construction: Manage the moisture content within the improved body using flow values. After construction: Conduct uniaxial compression tests on cores taken from the site at 28 days of age by a third-party organization. ⬛︎ The Concept of "Strength Ratio ≥ 1" The pre-test is conducted using the soil with the lowest strength manifestation, and during construction, the best quality soil is used as much as possible, leading to the design philosophy that "on-site test specimen strength / pre-test laboratory mix strength ≥ 1." This can also be utilized in construction plans and quality management explanatory materials. ▶ If you have concerns about ground improvement, please feel free to consult with us.

How can the quality of ground improvement be proven? - Three management practices to minimize the "discrepancy" between indoor mixing tests and field strength.

basic information

For more details, please download the catalog or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the catalog or feel free to contact us.

Introduction to the Super Rappu El Need Method

PRODUCT

Method Manual: Cost Comparison and Basic Process Photos

PRICE

Method Manual - Technical Specifications

TECHNICAL

Distributors

The Elneed Association handles the "Super Rappuru Basic Construction Method (Elneed Method)." This method uses stabilized soil created by mixing construction-generated soil with water and cement-based solidifying agents, and it is an improved version of the Rappuru concrete method for construction foundations. Our member companies are located from Tohoku to Kyushu, allowing us to respond to requests from all over the country. Please feel free to contact us when you need our services.