200-Year Concrete, Re-vibration High-Density Concrete, JS/JPS Method
Introduction of case studies on re-vibration construction! Reducing cracks and increasing service life! Also contributes to total cost reduction.
Our "JS Method and JPS Method" is a new construction technique that enables high-density concrete to be simultaneously poured in one go through re-vibration, achieving reductions in construction time, labor, and total costs, while also enhancing durability, service life, and the asset value of buildings. In our case studies, we clearly introduce the features of the "JS Method and JPS Method," as well as the differences from conventional methods and the construction techniques used. 【Features】 ■ Significantly reduces cracking ■ Lower cost compared to conventional methods ■ Excellent delay effect on carbonation *For more details, please download the catalog. Feel free to contact us with any inquiries.
basic information
【Construction Procedure】 1. Leveling (Re-vibration machine) 2. Concrete roughening (Roughening machine) 3. Resin spraying (Spraying machine) 4. Compaction (Roller) 5. Discing (Trowel) 6. Finishing (Handman) *For details, please refer to the catalog download. Feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us.