フジコン Official site

Self-operated line manhole, transmission and distribution manhole.

Installation of piping connection materials is also OK! It will help improve on-site workability!

Due to the large precast box, early site restoration is possible compared to cast-in-place manholes. As our standard product, the horizontal split significantly improves workability. It is also effective in sites with time constraints, such as nighttime work. ★Examples of use in self-owned line construction: Solar power plants (mega-solar) Wind power plants Hydropower plants etc.

basic information

Standard sizes Example) D950*W3000*H1500 D950*W2200*H1500 D1000*W3400*H1500 D1060*W4200*H1500 and many more available. *Please also leave any other special size requests to us!

Price range

Delivery Time

Applications/Examples of results

There are many delivery achievements in various government agency projects. ★Examples of use in self-operated line construction: Solar power plants (mega-solar) Wind power plants Hydropower plants and more Delivery within and outside the prefecture is also possible!

Various concrete products (FC hand holes) [*Currently available for free*]

PRODUCT

No Utility Pole / Joint Trench Catalog

TECHNICAL

Distributors

Recommended products