富士化工 Official site

Fujii GRP Pipe, Fujii Polyren-PP Construction Video

Electric fusion welding using a barcode controller

This video outlines the general flow of the construction process, so please refer to the construction manual for details. 【Image Overview】 ◆ Prepare the necessary tools for joining ◆ Deburring (pipe cutting surface) ◆ Clean the fusion area with acetone or alcohol (pipe and fitting) ◆ Mark insertion length (please use a dedicated marker) ◆ Insert and secure (set in the fixing jig) ◆ Prepare the controller ◆ Set the connector on the fitting terminal pin ◆ Barcode scanning ◆ Check the content displayed on the LCD panel (please confirm the power-on time in the construction manual) ◆ Start ⇒ Begin power supply ◆ Fusion complete ⇒ Confirm indicator rise ◆ Cool for more than 10 minutes ◆ Remove the fixing jig ⇒ Fusion complete ◆ Additional notes

Related Link - http://www.fujikako.co.jp/product/index.html#FPGRP

basic information

【Features】 ■ Excellent chemical resistance and electrical insulation ■ Superior cold and heat resistance (operating temperature range -10℃ to 100℃) ■ Pipes and fittings are integrated by melting and joining, eliminating the risk of disconnection or leakage at the joints ■ Weighs 1/8 of steel pipes, making it lightweight and easy to handle ■ High mechanical strength against tension, internal pressure, and impact ■ Good weather resistance, suitable for long-term outdoor use ■ Excellent thermal insulation and cooling properties (thermal conductivity is about 1/270 of steel pipes)

Price range

Delivery Time

Applications/Examples of results

For more details, please request the materials or view the catalog PDF data from the download.

Related Videos

High-temperature drainage pipe "Fuji GRP Pipe" (reinforced polypropylene double-layer pipe)

PRODUCT

Pressure Use Fuji Polyren-PP" "Pressure Use Fuji GRP Pipe

PRODUCT

Distributors

Recommended products