Fujii GRP Pipe, Fujii Polyren-PP Construction Video
Electric fusion welding using a barcode controller
This video outlines the general flow of the construction process, so please refer to the construction manual for details. 【Image Overview】 ◆ Prepare the necessary tools for joining ◆ Deburring (pipe cutting surface) ◆ Clean the fusion area with acetone or alcohol (pipe and fitting) ◆ Mark insertion length (please use a dedicated marker) ◆ Insert and secure (set in the fixing jig) ◆ Prepare the controller ◆ Set the connector on the fitting terminal pin ◆ Barcode scanning ◆ Check the content displayed on the LCD panel (please confirm the power-on time in the construction manual) ◆ Start ⇒ Begin power supply ◆ Fusion complete ⇒ Confirm indicator rise ◆ Cool for more than 10 minutes ◆ Remove the fixing jig ⇒ Fusion complete ◆ Additional notes
basic information
【Features】 ■ Excellent chemical resistance and electrical insulation ■ Superior cold and heat resistance (operating temperature range -10℃ to 100℃) ■ Pipes and fittings are integrated by melting and joining, eliminating the risk of disconnection or leakage at the joints ■ Weighs 1/8 of steel pipes, making it lightweight and easy to handle ■ High mechanical strength against tension, internal pressure, and impact ■ Good weather resistance, suitable for long-term outdoor use ■ Excellent thermal insulation and cooling properties (thermal conductivity is about 1/270 of steel pipes)
Price range
Delivery Time
Applications/Examples of results
For more details, please request the materials or view the catalog PDF data from the download.