ハマキャスト Official site

Example 14: Renovation using a tile detachment prevention method to enhance the safety of public libraries.

The tiled exterior wall of the public facility (library) has been renovated using the transparent resin type tile detachment prevention method "Clear Net Anchor Method."

This is an example of renovating the exterior wall of an existing public facility (library) using the color-retaining tile shedding prevention method "Clear Net Anchor Method." 【Property】 [Renovation] Certain Library ◇ Construction Date: January 2017 ◇ Construction Area: 1,526m2 ◇ Substrate: Porcelain Tile 【Customer's Issues and Requests】 ◆ Since it is a public facility (library) used by many citizens, the design of the tiles was to be preserved while considering safety. In 2012, the same method was adopted (constructed) for part of the facility. ◆ In 2017, tile shedding occurred in the unrenovated areas, prompting an urgent full renovation using the same method. 【Adoption Background】 ◇ Although part of the facility (approximately 300m2) had been renovated using our method in 2012, tile shedding occurred in the unrenovated areas in 2017, leading to an urgent full renovation using the same method. 【Selection Points】 ◆ By covering the wall surface with resin and netting and securing it to the structure with anchor pins, the color and design of the existing tile exterior wall are preserved, preventing tile shedding and improving safety and durability. ◆ The dedicated topcoat protects the substrate, enhances durability and weather resistance, and aims for a longer lifespan. ◆ This method has obtained a construction technology review certification (construction technology).

Related Link - https://www.hamacast.co.jp/products/cna.html

basic information

Color Retention Tile Shedding Prevention Method "Clear Net Anchor" A method that prevents shedding while maintaining the design and color of existing tile walls. It covers the tile wall without removing the existing finish layer (tile/mortar). *For more details, please refer to the PDF document or feel free to contact us.*

Price range

Delivery Time

Applications/Examples of results

【Standard Construction Process】 [1] Wall (Tile) Inspection → [2] Tile Wall Repair (Injection Repair for Loose Areas / Repair for Missing Areas) → [3] Tile Wall Cleaning → [4] Marking → [5] Drilling Anchor Pin Holes (m2, 4 pieces) → [6] Application of Special Waterproof Primer → [7] Application of Hamaclear Resin (2 coats) → [8] Attachment of Hamaclear Net (embedded in resin) → [9] Driving in Anchor Pins (m2, 4 pieces) → [10] Epoxy Resin Injection → [11] Application of Hamaclear Resin (2 coats, finishing coat) → [12] Application of Special Top Coat (2 coats) → [13] Completion

Color tone retention type tile falling prevention method "Clear Net Anchor"

PRODUCT

Distributors

Recommended products