"Visualization" of drainage facilities due to the amendment of the "Water Pollution Prevention Act".
To enable easy leakage inspections, drainage systems containing harmful substances are required to be "visualized."
In June 2012, the "Water Pollution Prevention Act," aimed at preventing soil and groundwater contamination, was amended, requiring drainage systems that include chemicals to be "visualized" for leakage inspections through visual checks. By using the immediate drainage system "Sokuhai-kun 2," which directly connects the drainage pipe from the equipment and pumps up the wastewater, it is possible to achieve space-saving, low-cost, and relatively short-term "visualization." The drainage systems of 57 facilities at national research institutions were upgraded from a natural flow underground drainage pipe system to a pumped drainage and overhead piping system, making it easier to conduct visual inspections of the drainage equipment.
basic information
【Installation Examples】 ■ Sinks for experimental wastewater in research facilities and universities (rinse water for equipment after the 3rd to 4th use) ■ Water-related fixtures within factories (general wastewater) ■ Water-related fixtures within buildings (general wastewater and sewage) * The case studies can be viewed immediately from the "Catalog Download." Feel free to contact us.
Price information
Standard price ¥216,000 and up
Price range
P3
Delivery Time
OTHER
Model number/Brand name
Drainage Pump 2 Wastewater and General Drainage Use: H-NA(V) Type, H-NB(V) Type General Drainage Use: H-NS Type, H-NL Type, H-NT Type, H-NTB Type
Applications/Examples of results
For more details, please refer to the catalog. Feel free to contact us.