Example: Wastewater and miscellaneous drainage from the temporary on-site office.
Two operational units have been installed at the temporary office on-site where the slope cannot be directed to the drainage pit! During the concentrated break time, both units operate simultaneously!
Pumping drainage from a temporary office that is far from the drainage pit and cannot achieve a slope is done using the Sokuhaikun 2. We operate two units simultaneously during peak usage times, such as breaks, and provide backup operation with a standby pump in case of pump failure, ensuring safe usage. Even in sites with constraints on operation periods and space, we have been able to establish low-cost drainage facilities in a short time. 【Features】 ■ No need for a drainage pit ■ Pumps are made of cast iron, sturdy and quiet ■ Semi-vortex impeller for wastewater ■ Inline type allows for space-saving installation ■ Can be installed quickly and at low cost *For more details, please contact us or download the catalog to view.
basic information
For more details, please contact us or download the catalog to view it.
Price range
Delivery Time
Applications/Examples of results
Example of Achievements: ■Temporary Site Office
catalog(2)
Download All CatalogsCAD data(14)
Model number | overview | File |
---|---|---|
Jipai Jun 2 (H-NL5.4S・H-NL6.4S) |
|
|
Jipai Jun 2 (H-NL5.4S・H-NL6.4S) |
|
|
Dual operation mode for the H-NL type of the Ji Pai Jun 2 (two units). |
|
|
Dual operation mode for the H-NL type of the Ji Pai Jun 2 (two units). |
|
|
Ji Pai Jun 2 (H-NS5.4S) |
|
|
Ji Pai Jun 2 (H-NS5.4S) |
|
|
Operation mode of two units of the H-NS type for the Jipai Jun 2. |
|
|
Dual operation mode for the H-NS type of the Jikai-kun 2 (two units). |
|
|
Jiangpai Jun 2 (H-NT5.75・H-NT6.75) |
|
|
Jipai Jun 2 (H-NT5.75・H-NT6.75) |
|
|
Dirty Waste Chucky Box (DYCV50 Model) |
|
|
Dirty Waste Chucky Box (DYCV50 Model) |
|
|
Ball Valve (VP-600 Type) |
|
|
Ball Valve (VP-600 Type) |
|