北越融雪 Official site

[Construction Case 12] Complex Cultural Facility Roof Snow Melting (Hot Water Type, Concealed Method)

The concrete slab is cut out only around the perimeter, and snow-melting panels are installed! Aluminum composite three-layer pipes are used.

We would like to introduce a case study of roof snow melting (hot water type, concealed method) installation. In the construction of a highly designed complex cultural facility, the design was progressing with a structural strength capable of withstanding 6 meters of snow. However, due to concerns about the impact of snow falling from the roof perimeter onto the surrounding area, it was decided to incorporate roof snow melting urgently. The concrete slab was box-cut only at the perimeter to install the snow melting panels, and considering the long piping length and evaporation of hot water due to induced lightning, aluminum composite three-layer pipes were adopted instead of copper pipes. 【Case Overview】 ■ Tokamachi City, Niigata Prefecture ■ Wall-mounted gas boiler ■ 477 m² *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.hokuetsuyusetsu.com/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Construction Examples] Solving Snow-Related Issues! Snow Melting Equipment Examples 12-14

TECHNICAL

Snow Melting Equipment Comprehensive Catalog

CATALOG

Distributors

Recommended products