[Construction Example 13] Office Roof and Pavement Snow Melting (Hot Water Type, Exposed/Buried Method)
Melting snow on the parking lot surface and the office/canopy roof! A case study using exposed piping with SGP piping!
We would like to introduce examples of snow melting systems for roofs and pavement (hot water type, exposed method, buried method). In the process of rebuilding the office and fuel supply facility, it was necessary to establish a 24-hour system for receiving tank trucks, so we decided to melt the snow on the parking lot pavement and the office and canopy roof. Although it is a newly constructed building, the roof finish was corrugated metal, so we opted for the exposed method using SGP piping. Since the required temperature range for roof snow melting and pavement snow melting differs, we mixed the hot water from both piping systems to optimize the outlet temperature. 【Case Overview】 ■ Tokamachi City, Niigata Prefecture ■ Gas boiler ■ 688m2 *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.