北越融雪 Official site

[Construction Case 14] Elderly Complex Facility Road Surface Snow Melting (Hot Water Type, Buried Method)

Adoption of warm water snow melting construction! It does not hinder the parking and stopping of user shuttle vehicles, and also reduces the labor of the manager.

We would like to introduce a case study of surface snow melting (hot water type, buried method) at a senior complex facility. In the construction of a multi-purpose facility that includes serviced housing for the elderly, day services, and childcare support, surface snow melting was planned to avoid hindering the parking and stopping of user transport vehicles and to reduce the labor of the facility manager. Due to the difficulty of securing sufficient water volume for large-scale sprinkling of snow melting in a building facing a national highway, and considering that finishing the area from the parking lot to the approach in a dry condition would be more user-friendly, a hot water type snow melting system was adopted. [Case Overview] ■ Tokamachi City, Niigata Prefecture ■ Kerosene boiler ■ 253m2 *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.hokuetsuyusetsu.com/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Construction Examples] Solving Snow-Related Issues! Snow Melting Equipment Examples 12-14

TECHNICAL

Snow Melting Equipment Comprehensive Catalog

CATALOG

Distributors

Recommended products