JFEシビル 社会基盤事業部 Official site

[Metal Road Construction Method Case Study] Miyagi Prefecture, New Road Construction Project for Onagawa Dejima Line Town Road

Hand-stretched construction is possible with plate pressing! An example from the "Dejima Bridge Project" connecting the mainland and remote islands.

Here is an example of the "Metal Road Construction Method" in Onagawa Town, Oshika District, Miyagi Prefecture. This method was adopted as part of the new road construction on the mainland side of the "Dejima Bridge Project," which connects the mainland to the islands. The construction site is surrounded by the sea and has access from only one direction, which allowed for the evaluation of hand-extended construction using a single push. Additionally, due to its coastal location, the design takes into account aesthetics and corrosion prevention. 【Case Overview】 ■ Client: Onagawa Town, Miyagi Prefecture ■ Total Length: 90.0m ■ Width: 7.7m ■ Number of Piles: 90 ■ Weight of Steel Pipe Piles: 152.8t ■ Weight of Girders: 428t *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.jfe-civil.com/infra/metalroad/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

029-01 Civil Newsletter [Season Letter] Introduction to Metal Road Construction Method Projects

TECHNICAL

Distributors

Recommended products