[Case Study of Super Jack System] Expressway

With precise centralized management, safe and secure construction and load data management are possible! Adjustments using repair materials are also easy.

We would like to introduce a case where our "Super Jack System" for bearing replacement was adopted for a highway project. Traditionally, the operation of jacking up the superstructure during bearing replacement was done manually. This system allows one operator to control all hydraulic jacks, enabling construction without the need to assign personnel to each jack. In this project, we implemented the bearing replacement work by centrally and automatically controlling 26 hydraulic jacks. Additionally, it has been highly evaluated for its effectiveness and has been adopted in other projects as well. 【Case Overview】 <Challenges> ■ Traditionally, the operation of jacking up the superstructure during bearing replacement was done manually. <Solution> ■ One operator can control all hydraulic jacks, allowing construction without the need to assign personnel to each jack. ■ Adjustment work using repair materials is also easy. ■ It is possible to save data on the load and displacement applied to the actual bearing. *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.jfe-civil.com/infra/tokkou/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

029-02 Civil Newsletter [Season Letter] Introduction of the Super Jack System

TECHNICAL

Distributors

Recommended products