JFEシビル 社会基盤事業部 Official site

Road construction method "Metal Road Method" [For road construction in steep slopes of mountainous areas!]

JFE Civil's unique construction method suitable for road construction on steep slopes in mountainous areas! Strong against "earthquakes" and "heavy rain," and quick to "recover."

The "Metal Road Construction Method" is a "three-dimensional frame prefabricated bridge" used for "permanent roads" where the piles at the grid points are rigidly connected to the cross beams and main beams. Since it is not a wall structure, it is less affected by backwater. By embedding the piles into the supporting ground, it provides stable support for road structures. Additionally, it allows for designs that consider the disappearance of failure layers such as landslides. Please feel free to contact us when you need our services. 【Three Reasons for Disaster Resistance】 ■ High durability structure ■ Supported by a bearing layer ■ Design based on disaster scenarios *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.jfe-civil.com/infra/metalroad/

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Disaster-resistant metal road construction method

CATALOG

035-01 Civil Newsletter [Season Letter] Introduction to Metal Road Construction Method Projects

TECHNICAL

Distributors

JFE Civil Corporation has been developing its business in various fields based on its track record and technical expertise in maintaining JFE Steel's steelworks for many years. We deliver valuable business from planning to construction and maintenance support. We are the only comprehensive construction company in the JFE Group.

Recommended products