All products and services
151~180 item / All 183 items
-

Ground investigation plate load test
A test to directly measure the bearing capacity characteristics of the original ground and investigate the ultimate bearing capacity.
last updated
-

Ground investigation - Automatic Static Cone Penetration Test
Ideal for confirming the support layer of steel pipe piles!
last updated
-

Ground reinforcement construction lineup
https://www.jiban.co.jp/service/kouji/index.htm#01
last updated
-

Ground reinforcement work using the Geo-column method.
Support the important house with pillars of improvement.
last updated
-

Ground improvement work - surface improvement method
Support the important home with an improved version on the board.
last updated
-

Ground reinforcement work using small-diameter steel pipe pile method.
Support your important home with a strong foundation.
last updated
-

Ground reinforcement construction [Certified method] SMD method
Three-story, reinforced concrete structure, retaining wall, etc., optimal as a ground reinforcement method requiring government approval!
last updated
-

Ground reinforcement work [Performance Guarantee Method] ETP-G Method
Rotary driven steel pipe piles suitable for small-scale buildings.
last updated
-

Ground reinforcement construction [Performance certification method] RES-P method
Strengthening weak ground to protect the safety of homes.
last updated
-

Ground reinforcement work [Performance certification method] Tiger pile
High-performance hybrid column
last updated
-

Ground reinforcement work [Performance certification method] Σ-i method
A culmination of all the elements necessary for steel pipe piles.
last updated
-

Ground reinforcement construction [Performance certification method] DM method
Pile-type ground reinforcement method using small-diameter steel pipes with tip wings.
last updated
-

Ground reinforcement construction [Performance certification method] Pure pile method
Pile foundation reinforcement method for detached houses
last updated
-

Ground reinforcement work [Performance certification method] Cross-wing column method
Slurry-type mechanical stirring deep mixing method
last updated
-

Subsidence correction, different subsidence survey
To restore the tilted house, we will assess the current situation.
last updated
-

Submerged correction work using steel pipe pile driving method.
I will restore the tilted house.
last updated
-

Submerged correction work i-LEFT method
Easily lift up tilted or sunken houses.
last updated
-

Proposal for Submergence Correction Work
If different subsidence occurs, leave it to us.
last updated
-

Foundation ground design support
A service where specialized foundation engineers assist with design.
last updated
-

Ground reinforcement construction [Certified method] ETP method
Steel pipe piles with advanced wings, Ministry of Land, Infrastructure, Transport and Tourism Minister Certification
last updated
-
Soil contamination investigation
Soil contamination investigation
last updated
-
Geographical and historical survey
Geographical and historical survey
last updated
-
Subsidance correction work
Buildings that have tilted can be corrected with sinking repair work!
last updated
-

Soil Survey Services by Geotech for Golf Courses
Geotech supports drainage measures for golf courses.
last updated
-

Geotech's Soil Investigation Services for Real Estate
We consider the safety of "housing" and "land" and protect the asset value of real estate.
last updated
-

Geotech Soil Investigation Services for Construction
Considering the safety of "residential" and "soil." Geotech's soil investigation services.
last updated
-

Foundation Reinforcement Construction System "Ganko Oyaji"
A foundation reinforcement construction system with low cost, high safety, and short construction period!
last updated
-

i-LIFT Method
Easily lift up tilted or sunken houses!
last updated
-

Method of repair work: "Settlement Repair Work"
A building that has tilted can be corrected with sinking repair work!
last updated
-

Ground investigation service "Liquefaction Survey"
We have prepared a four-stage method ranging from a preliminary assessment based on data to a detailed assessment involving boring investigations.
last updated