ジオテック Official site

Geotech [Communication Base Station] Ground reinforcement with Tiger Pile

Achieving both short construction periods and high support strength. Geotech's ground reinforcement solutions accelerate the installation of base stations.

In the construction of communication base stations, rapid infrastructure development within a limited timeframe and ensuring reliable bearing capacity according to the local ground conditions are essential. Adopting inappropriate construction methods on weak ground can lead to prolonged construction periods and increased costs due to soil disposal, posing a risk to the overall profitability of the project. Geotech's Tiger Pile method employs a hybrid technology that combines soil-cement columns with high-strength stepped steel pipes. By improving the vertical bearing capacity per improvement body and shortening the construction length, it strongly supports the rapid installation of base stations. 【Usage Scenarios】 - New construction and expansion of communication base stations - High-speed foundation construction on weak ground - Sites looking to minimize construction waste generation 【Benefits of Implementation】 - Significant compression of construction periods due to shortened execution time - Reduction in disposal and transportation costs due to decreased soil waste - Realization of rational construction by reducing the number of pouring locations with high bearing capacity

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

【Features】 - High load-bearing capacity achieved through the fusion of soil cement and stepped steel pipes - Reduced construction time and minimized generation of surplus soil - High quality stability based on GBR performance certification - Efficient component composition tailored to required load capacity - Real-time monitoring using the latest construction management equipment 【Our Strengths】 Geotech Co., Ltd. is a specialized company in ground engineering that offers a one-stop service from ground investigation to reinforcement design and construction. Leveraging our nationwide construction network and extensive experience, we support our clients' business plans with services that balance short construction periods, low costs, and high reliability.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with limited space where disposal costs for construction debris tend to be excessive, as well as in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers to provide clients with cost-effective and highly reliable ground reinforcement proposals.

Ground reinforcement work | A technical brochure providing high construction performance and high bearing capacity with the Tiger Pile method, achieving shortened construction periods and cost reduction | Geotech

TECHNICAL

Ground reinforcement work "Tiger Pile" | A hybrid ground reinforcement method combining stepped steel pipes and soil cement | Geotech Co., Ltd.

PRODUCT

Ground reinforcement work | Technical documentation that objectively demonstrates high quality through real-time data using the Tiger Pile method, which has obtained GBR-C performance certification | Geotech

TECHNICAL

Distributors