ジオテック Official site

Data Center Ground Reinforcement: Tiger Pile Method

Achieving high support capacity and a short construction period. Optimized foundation with Tiger Piles ensuring seismic resistance for DC.

In the construction of data centers that support large-capacity servers, ground stability and adherence to schedules are essential. Unaddressed soft ground can lead to differential settlement and reduced seismic resistance. The Tiger Pile method, which combines soil-cement columns and high-strength stepped steel pipes, maximizes vertical load-bearing capacity per pile. It optimizes construction time and costs while maintaining high seismic resistance and reliability. 【Usage Scenarios】 - Addressing soft ground during new data center construction - Building high-load foundations - Projects that prioritize construction time - Sites where soil disposal needs to be minimized 【Implementation Effects】 - High load-bearing capacity secured by steel pipe core materials - Cost reduction through shortened construction time - Reduced soil disposal costs - Quality stability through monitoring

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

【Features】 - High load-bearing capacity achieved through the fusion of soil cement and stepped steel pipes - Reliable design based on GBR performance certification (No. 06-12 Rev. 4) - Efficient component configuration tailored to required load capacity (φ400, 500, 600 mm) - Real-time monitoring using the latest construction management equipment 【Our Strengths】 Geotech Co., Ltd. is a specialized company in ground improvement that offers a one-stop service from ground investigation to reinforcement design and construction. With extensive experience and proven technical skills, we leverage our nationwide construction network to provide high-quality ground reinforcement services that support the stable operation of data centers.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with limited space where disposal costs for construction debris tend to be excessive, as well as in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers to provide clients with cost-effective and highly reliable ground reinforcement proposals.

Ground reinforcement work | A technical brochure providing high construction performance and high bearing capacity with the Tiger Pile method, achieving shortened construction periods and cost reduction | Geotech

TECHNICAL

Ground reinforcement work "Tiger Pile" | A hybrid ground reinforcement method combining stepped steel pipes and soil cement | Geotech Co., Ltd.

PRODUCT

Ground reinforcement work | Technical documentation that objectively demonstrates high quality through real-time data using the Tiger Pile method, which has obtained GBR-C performance certification | Geotech

TECHNICAL

Distributors