ジオテック Official site

Tiger Pile Method for Commercial Facilities | Geotech

Achieving both early opening of commercial facilities and cost optimization with high support strength and construction efficiency.

In commercial facility development, early opening affects profitability. Inappropriate construction methods for weak ground can lead to risks in construction duration and budget due to extended construction time and increased surplus soil. The Tiger Pile method places high-strength stepped steel pipes in soil-cement columns, improving the vertical bearing capacity per pile. This achieves a reduction in construction length and compression of the construction period. 【Usage Scenarios】 - Ground reinforcement for new commercial facilities - Development projects that prioritize construction time - Sites where surplus soil control is necessary 【Implementation Effects】 - Compression of construction period due to shortened construction time - Reduction in disposal costs due to decreased surplus soil - Budget control through reduced pouring

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

【Features】 - High load-bearing capacity through hybrid technology of soil cement and stepped steel pipes - High quality stability based on GBR performance certification (No. 06-12 Rev. 4) - Rational construction achieved with an efficient component configuration according to required load-bearing capacity - Real-time monitoring with the latest construction management equipment 【Our Strengths】 Geotec Co., Ltd. is a specialized company in ground engineering that provides one-stop services from ground investigation to reinforcement design and construction. Utilizing our nationwide construction network and extensive experience, we support our customers' business plans with services that combine short construction periods, low costs, and high reliability.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with narrow lots where disposal costs for construction debris tend to be excessive, and in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers when proposing cost-effective and reliable ground reinforcement options to clients.

Ground reinforcement work | A technical brochure providing high construction performance and high bearing capacity with the Tiger Pile method, achieving shortened construction periods and cost reduction | Geotech

TECHNICAL

Ground reinforcement work "Tiger Pile" | A hybrid ground reinforcement method combining stepped steel pipes and soil cement | Geotech Co., Ltd.

PRODUCT

Ground reinforcement work | Technical documentation that objectively demonstrates high quality through real-time data using the Tiger Pile method, which has obtained GBR-C performance certification | Geotech

TECHNICAL

Distributors