Tiger Pile Method | Ground Reinforcement for Detached Houses
Achieving both shortened construction periods and cost reduction. Optimizing ground reinforcement for single-family homes with high support capacity.
The Tiger Pile Method is a solution that simultaneously achieves a reduction in construction time and cost for ground reinforcement in single-family homes. It avoids excessive construction and budget pressure from soil disposal on weak ground, while also mitigating the risk of uneven settlement. By using a hybrid technology with high-strength stepped steel pipes as the core material in soil cement columns, the vertical bearing capacity per pile is improved. This shortens the construction length, optimizing both the construction period and costs. 【Usage Scenarios】 - Foundation work for single-family homes on weak ground - Residential projects that need to be completed in a short period - Sites that want to reduce the amount of construction waste generated 【Effects of Implementation】 - Significant reduction in construction length leading to compressed construction time - Reduction in disposal and transportation costs due to decreased soil volume - Cost control through a reduction in the number of pouring locations
basic information
【Features】 - High load-bearing capacity achieved through the fusion of soil cement and stepped steel pipes - High reliability based on GBR performance certification (No. 06-12 Rev. 4) - Efficient and rational component configuration according to required load-bearing capacity - Design flexibility suitable for buildings up to three stories above ground 【Our Strengths】 GeoTech Co., Ltd. offers a one-stop service from ground investigation to reinforcement design and construction. With real-time monitoring using the latest construction management equipment and a nationwide construction network, we provide ground reinforcement services that combine short construction periods, low costs, and high reliability, strongly supporting our customers' business plans.
Price information
Delivery Time
Model number/Brand name
Ground reinforcement work
Applications/Examples of results
It is ideal for situations where reducing construction costs and shortening construction periods are the top priorities in foundation ground reinforcement work for detached houses, apartments, and small-scale stores. Additionally, it demonstrates extremely high effectiveness in urban areas with limited space where disposal costs for construction debris tend to be excessive, as well as in densely populated residential areas where minimizing the traffic of material delivery vehicles is desired. It is widely adopted as a practical solution for construction companies and house manufacturers to provide clients with cost-effective and highly reliable ground reinforcement proposals.
catalog(4)
Download All Catalogs