ジオテック Official site

CWC Method | Ground Reinforcement for Factory Plants - Geotech

Proving ground quality through visualization. The CWC method supports a stable operational foundation.

Long-term ground stability is essential for the weight and vibration of plant equipment. Differential settlement can lead to decreased production accuracy and risks of shutdown, necessitating objective quality certification. GeoTech Corporation's Cross-Wing Column Method (CWC Method) ensures the designed bearing capacity through digital visualization of construction data, establishing a stable factory environment. 【Usage Scenarios】 - Ground reinforcement during the installation of large machinery and heavy equipment - Settlement measures to maintain production line accuracy - Ground investigation and reinforcement associated with factory expansion 【Benefits of Implementation】 - Objective quality certification through automatic recording of all data - Smooth application of ground guarantee insurance by ensuring traceability - Provision of stable bearing capacity with uniform columns through patented technology

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

【Features】 - High-quality mixing performance with six patented cross mixing blades - Real-time monitoring of rotation speed, injection volume, etc., using construction management devices - Compatible with various ground conditions such as sandy soil, clayey soil, and loam layers - A highly reliable method certified by GBRC performance certification (No. 12-17, Revision 1) - Deep mixing treatment capable of accommodating a maximum improvement length of 22m 【Our Strengths】 Geotech is a specialized company in ground engineering that provides a one-stop service from ground investigation to reinforcement design and construction, as well as soil contamination surveys. Under our unique QMS compliant with ISO 9001, certified engineers oversee site management, supporting the ground of your factory plant with extensive experience and solid technical skills.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

This construction method is ideal for architectural and civil engineering projects that require transparency in the construction process and high reliability based on data. It demonstrates its effectiveness when visualizing construction data to present to third parties or clients in residential subdivisions, apartment complexes, commercial stores, and exterior retaining wall projects. It ensures complete traceability of data and is widely chosen as foundation reinforcement by house manufacturers, construction companies, and real estate management firms that want to eliminate future settlement risks and apply reliable ground guarantee insurance.

Ground reinforcement construction | The CWC method provides high transparency in construction quality and reliable ground guarantees through real-time automatic measurement of all casting data and a QMS system.

TECHNICAL

Ground Improvement Work "Cross Wing Column Method" Performance Certification | Deep Mixing Method that Forms High-Quality Columns with Unique Mixing Wings | Geotech Co., Ltd.

PRODUCT

Cross Swing Column Method

PRODUCT

Ground reinforcement work | Providing reliable ground guarantees through real-time management of all casting data and a consistent support system based on QMS with the CWC method | Geotech

TECHNICAL

Distributors