Immediate foundation construction and shortened construction period with zero-cure rotary driven steel pipe piles.

Eliminate the waiting period for curing with small-diameter steel pipe piles that do not use cement. By starting the foundation work immediately after pouring, we achieve a reduction in construction time and costs.

This is a ground reinforcement solution using small-diameter steel pipe piles for projects that prioritize shortening construction periods. It completely eliminates the bottleneck of waiting for strength development associated with conventional cement improvement methods in soft ground measures. This method involves the rotary insertion of high-strength steel pipes in a completely dry construction process, allowing for the start of foundation work immediately after installation is completed, without any waiting for curing. It also eliminates the risks of muddy conditions and site contamination during rainy weather, dramatically reducing project delays. It is suitable for single-family homes, stores, and retaining walls up to three stories above ground, and allows for clear bearing capacity calculations based on SWS testing. Geotech ensures construction without rework through rapid equipment arrangement and real-time quality verification using digital management devices, strongly supporting tight project schedules.

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

This construction method is a rotary penetration pile method that responds to immediate loads, consisting of general structural carbon steel pipes with an outer diameter of φ89.1mm to φ216.3mm and high-penetration tip wings. The applicable conditions are small-scale buildings with up to 3 stories, a height of 13m or less, and a total floor area of 1,500 square meters or less, as well as retaining walls with a height of 3.5m or less. The maximum construction depth is 130 times the pile diameter (up to a maximum of 19.2m, etc.), suitable for sandy soil, clay, and loam layers. It has obtained public performance certification and achieves a high level of both short construction periods and safety through a clear calculation formula based on SWS test results.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for commercial stores with a set opening date, housing projects requiring short-term completion, temporary buildings, and foundation reinforcement for urgent restoration work. It also demonstrates strengths in sites where concerns about cement quality deterioration and curing delays arise during the rainy season or winter construction. It is widely used in narrow sites where heavy machinery needs to be brought in immediately after pouring to transition to the next foundation work, and in densely populated residential areas where there is a desire to minimize construction days out of consideration for neighbors, with the aim of reducing total construction time and temporary costs.

Ground reinforcement work | Eliminating the need for a curing period allows for immediate foundation construction on the same day as pouring, significantly shortening the construction schedule and reducing on-site costs with a small-diameter steel pipe pile method | Geotech

TECHNICAL

Small-diameter steel pipe pile construction method

PRODUCT

Ground reinforcement construction "Small-diameter steel pipe pile method" | A reliable support pile method that penetrates deep soft ground and supports buildings on high N-value layers | Geotec Co., Ltd.

PRODUCT

Ground reinforcement work | A small-diameter steel pipe pile method that responds to bidirectional loads of compressive load and pull-out resistance, preventing differential settlement and structural collapse during major earthquakes | Geotech

TECHNICAL

Distributors