ジオテック Official site

Ground reinforcement work | The necessity of protecting buildings with public performance certification and advanced quality management.

Strengthening ground reinforcement work with public performance certification and strict quality control. Achieving high reliability in foundation quality through comprehensive pouring data tracking.

The Tiger Pile Method is a reliable technology that has obtained the GBR Performance Certification (No. 06-12 Rev. 4) from the Japan Building Disaster Prevention Association. Based on numerous actual column loading tests, it maximizes the composite effect of soil-cement columns and stepped steel pipes through a formula for allowable bearing capacity, eliminating strength variability. GeoTech Co., Ltd. records rotational torque and penetration depth in real-time using specialized equipment based on ISO 9001 certified QMS. By ensuring traceability through electronic storage, it reduces the risk of differential settlement and protects the trust of clients and designers.

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

The Tiger Pile Method has objective specifications that have obtained the GBR Performance Certification (No. 06-12 Rev. 4) from the General Incorporated Foundation Japan Building Disaster Prevention Association. The applicable conditions are for buildings with three stories or less above ground, a eaves height of 10 meters or less, a total floor area of 8,000 m² or less, and retaining walls with a height of 5 meters or less, with a design ground pressure of 300 kN/m² or less. The reinforcement body consists of column diameters of φ400, φ500, and φ600 mm, as well as hot-formed stepped steel pipes (φ76.3 mm, φ114.3 mm), accommodating pipe lengths of 0.5 to 8.0 meters. It is a specification that proves quality through automatic recording by a construction management device.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is ideal for various housing projects that require reliable design quality and construction certification, as well as for practical sites that need clear data submission to confirmation application agencies and defect insurance. It is particularly widely used in small-scale detached houses, three-story buildings, and retaining wall reinforcement designs, where objective calculations of allowable vertical bearing capacity based on public performance certification are emphasized. It is utilized in the practices of designers and construction companies who want to provide clients with peace of mind and solid construction evidence through ISO 9001-compliant construction management and electronic data recording.

Ground reinforcement work | Technical documentation that objectively demonstrates high quality through real-time data using the Tiger Pile method, which has obtained GBR-C performance certification | Geotech

TECHNICAL

Ground reinforcement work "Tiger Pile" | A hybrid ground reinforcement method combining stepped steel pipes and soil cement | Geotech Co., Ltd.

PRODUCT

Distributors