Narrow Site SMD Method | Ground Reinforcement and Solutions for Construction Challenges in Densely Built Residential Areas
The SMD method, which achieves both consideration for neighbors and a shortened construction period in narrow sites and densely populated residential areas through non-excavation and non-curing construction using small machinery.
This is a minister-approved rotary driven steel pipe pile method that simultaneously achieves shortened construction periods and consideration for neighboring areas. The SMD pile method developed by Geotech Co., Ltd. overcomes challenges such as narrow access routes and the distance to adjacent buildings in confined sites and densely populated residential areas. By using small specialized construction machines like the DHJ series, smooth installation is possible even in sites where large heavy machinery cannot enter. The non-displacement method, which does not use cement solidification materials, eliminates the need for soil disposal and curing periods, allowing foundation work to begin immediately after completion. With low noise, low vibration, and zero cement scattering, it ensures trouble prevention and high-quality ground reinforcement based on thorough pre-investigation and real-time data management.
basic information
The SMD method is a space-saving rotary driven steel pipe pile construction method that accommodates the transportation and pouring of small construction machines (such as DHJ06-30). It has obtained certification from the Minister of Land, Infrastructure, Transport and Tourism (TACP-0112/0113, etc.) and features special wings with an outer diameter 2 to 3 times that of the tip of STK steel pipes with an axis diameter ranging from φ89.1mm to φ267.4mm. The maximum construction depth reaches 130 times the axis diameter (up to 34.8m) and can be widely applied to sandy and clayey soil layers. It is a completely dry construction method that does not require curing time, enhancing on-site construction efficiency and significantly compressing the overall construction period.
Price information
Delivery Time
Model number/Brand name
Ground reinforcement work
Applications/Examples of results
The SMD method is ideal for new construction and renovation projects in narrow access roads where large machinery cannot enter, such as flagpole lots, densely populated residential areas, and small sites. It is also utilized in construction projects that prioritize minimizing noise and vibration to neighboring homes, as well as in environmentally conscious projects that aim to avoid the scattering of cement milk and soil contamination. Furthermore, since it allows for immediate transition to foundation work after pouring, it is highly effective for residential and commercial construction projects that aim to complete the work within a short timeframe, as well as for foundation reinforcement under strict conditions near existing retaining walls.
catalog(3)
Download All Catalogs