ジオテック Official site

Ground Reinforcement RES-P Method | Zero Residual Soil and Immediate Start to Shorten Construction Period

Ground reinforcement RES-P method with no soil displacement and zero curing using thin-diameter steel pipes without cement. Significantly reduces leftover soil costs and processes.

It is essential to prevent the risk of distortion caused by uneven settlement of residential buildings through investigation and to protect asset value with ground reinforcement. The RES-P method involves driving slender steel pipes into the ground, enhancing load-bearing capacity through a composite effect with the soil, resulting in a piled raft foundation. Since it does not use cement solidifying agents, there is zero residual soil that becomes industrial waste, eliminating disposal costs. There is no curing period, allowing for immediate transition to foundation work right after pouring, which directly shortens construction time. Using small machinery based on a 2-ton truck, construction can be carried out in narrow spaces with low noise and low vibration. GeoTech Co., Ltd. ensures quality through data traceability via construction management devices and provides highly efficient reinforcement.

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

The reinforcing steel pipes used in the RES-P method have an outer diameter of 48.6 mm and a wall thickness of 2.4 mm, made of general structural carbon steel, and are treated for rust prevention. The application range of this specification is for small-scale buildings with up to 3 stories, a height of up to 13 meters, and a total floor area of up to 1,500 square meters (for single-story buildings, up to 3,000 square meters). The foundation structure corresponds to a shallow foundation with a long-term design ground pressure of 50 kN/square meter or less, as well as a mat foundation with a ground pressure of 80 kN/square meter or less. It can penetrate up to a maximum depth of 14 meters in cohesive soil and sandy soil.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

The main application is ground reinforcement work conducted during the construction of new detached houses, low-rise apartment buildings, and stores. It is ideal for projects that prioritize shortening construction periods at new sites or for sites that want to reduce disposal costs for excess soil generated by cement-based improvements. Since foundation work can begin immediately after pouring, it is effective in sites with strict schedule management. Additionally, it is widely used in narrow sites where large machinery cannot enter, in densely populated residential areas, and in construction sites that want to maintain a clean and leveled environment.

Ground reinforcement construction | Immediate start without curing period! The RES-P method for ground reinforcement reduces site costs and construction time significantly with zero leftover soil and no soil disposal. | Geotech

TECHNICAL

Acquisition of performance certification for ground reinforcement construction "RES-P method" | Piled raft foundation method that prevents settlement through the combined action of small-diameter steel pipes and the ground | Geotec Co., Ltd.

PRODUCT

Distributors