ジオテック Official site

Ground reinforcement work | RES-P method to thoroughly prevent settlement of weak ground

Zero settlement even on weak ground. The RES-P method firmly supports buildings through the combined effects of thin steel pipes and the ground.

The RES-P method simultaneously achieves the elimination of sinking accidents and the shortening of construction processes. Even in challenging areas such as soft ground and humus soil, it significantly improves foundation strength by continuously placing thin steel pipes with an outer diameter of 48.6 mm, utilizing the composite action with the ground. Since it does not use cement-based solidifiers, it allows for zero leftover soil and reduced disposal amounts, and there is no need to wait for curing, enabling immediate transition to the next process after pouring, thus shortening the construction period. The use of a 2-ton compact construction machine minimizes noise and vibration, ensuring consideration for nearby residents. Geotech Co., Ltd. provides safe and clean ground reinforcement with high-precision construction management and a nationwide network.

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

The reinforcement material used in the RES-P method is a general structural carbon steel pipe with an outer diameter of 48.6 mm and a wall thickness of 2.4 mm. The surface of the steel pipe is treated for rust prevention, ensuring long-term stability and durability underground. The applicable range is for small buildings with up to three stories above ground, a height of 13 meters or less, and a total floor area of 1,500 square meters or less (for single-story buildings, 3,000 square meters or less). The foundation type corresponds to a shallow foundation with a long-term allowable ground pressure of 50 kN/square meter or less, or a mat foundation with 80 kN/square meter or less. Reinforcement is possible for cohesive soil and sandy soil foundations up to a maximum depth of 14 meters.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

The main application is foundation ground reinforcement work in new construction plans for single-family homes, low-rise apartment buildings, and small-scale stores. It is ideal for sites where it is necessary to reliably suppress differential settlement due to the weight of the building on weak ground, humus soil, or muddy ground, thereby enhancing structural safety. Additionally, it is effective in projects where there is a desire to significantly reduce disposal costs and transportation efforts associated with construction waste from cement-based ground improvement, as well as in tight sites where immediate commencement of foundation work after pouring is desired without a curing period. It is widely utilized as a rational ground countermeasure that can directly adopt strip foundations or slab foundations.

Ground reinforcement work | Securely overcome the risk of settlement in weak ground! The RES-P method supports the foundation through the composite action of high-durability steel pipes and the ground | Geotech

TECHNICAL

Acquisition of performance certification for ground reinforcement construction "RES-P method" | Piled raft foundation method that prevents settlement through the combined action of small-diameter steel pipes and the ground | Geotec Co., Ltd.

PRODUCT

Distributors