ジオテック Official site

RES-P method | Ground reinforcement with zero soil displacement and zero curing

RES-P method with no soil disposal and zero curing. A ground reinforcement technology that compresses both construction costs and construction time through the combined effect of small-diameter steel pipes.

In ground reinforcement that ensures the long-term stability of buildings, the RES-P method fundamentally reduces the risks of uneven settlement and structural damage. This method involves continuously driving thin steel pipes with an outer diameter of 48.6 mm into soft ground, significantly enhancing the bearing capacity of the foundation through composite action with the ground. Since it does not use cement-based solidifiers, it generates zero residual soil, avoiding increased costs associated with industrial waste disposal and transportation. Additionally, because there is no need to wait for the solidifier to cure, the next phase can begin immediately after pipe installation, achieving a reduction in the overall construction schedule. The use of small machinery in the 2-ton class minimizes noise and vibration impacts, ensuring sufficient consideration for the surrounding environment. GeoTech Co., Ltd. provides construction services that balance cost optimization with reliable reinforcement performance through precise quality control using construction management devices.

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

The reinforcement members used in the RES-P method are general structural carbon steel pipes with an outer diameter of 48.6mm and a wall thickness of 2.4mm. The surface of the members is treated for rust prevention, ensuring long-term stability and durability when buried underground. The applicable targets are small-scale buildings with three stories or fewer, a height of 13m or less, and a total floor area of 1,500 square meters or less (for single-story buildings, 3,000 square meters or less). It can accommodate shallow foundations with a long-term design load of 50kN/square meter or less, or slab foundations with 80kN/square meter or less. The applicable ground conditions are cohesive soil and sandy soil, with a maximum construction depth of 14m. It is a reliable specification that has obtained GBRC technical performance certification and evaluation from the Japan Building Center.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

The main application is foundation ground reinforcement work during the construction of single-family homes, low-rise apartment buildings, and small-scale stores. It is ideal for projects that want to avoid the risk of settlement due to insufficient ground bearing capacity and aim to shorten the overall construction period. It is effective in sites where there is a desire to reduce disposal costs for excess soil generated by cement-based improvements and in tight project schedules where foundation work needs to begin immediately after pouring. Additionally, it is widely utilized in various construction sites that cannot afford a curing period, have limited space for large machinery, or prioritize hygiene maintenance and cost control.

Ground reinforcement construction | Achieving both shortened construction time and cost reduction with zero curing and no soil disposal! Preventing foundation settlement and protecting homes with the RES-P ground reinforcement method | Geotech

TECHNICAL

Acquisition of performance certification for ground reinforcement construction "RES-P method" | Piled raft foundation method that prevents settlement through the combined action of small-diameter steel pipes and the ground | Geotec Co., Ltd.

PRODUCT

Distributors