RES-P method | Ground reinforcement with zero residual soil cost and no soil disposal

Zero leftover soil with the penetration method! The low-noise RES-P method, which does not use cement, reduces disposal costs.

The RES-P method is a land reinforcement technique that achieves cost reduction through zero residual soil. As a countermeasure against settlement in weak ground, it uses only small-diameter steel pipes that are rotated and driven in, without using cement solidifiers, resulting in no residual soil that becomes industrial waste. This eliminates disposal costs and the hassle of transporting materials, significantly compressing the overall construction costs. The vibrations and noise during installation are extremely low, allowing for considerate construction even in narrow sites close to boundary walls. By using a lightweight 2-ton vehicle-based construction machine, we can smoothly transition to the next process without disturbing the site’s leveling condition. GeoTech Co., Ltd. provides optimal ground reinforcement that balances cost reduction and environmental protection through real-time construction management and reliable quality assurance.

Related Link - https://www.jiban.co.jp/service/kouji/index.htm

basic information

The RES-P method employs general structural carbon steel pipes with an outer diameter of 48.6mm and a wall thickness of 2.4mm as reinforcing members. The surface of the steel pipes is treated with effective anti-corrosion processes such as hot-dip galvanizing, ensuring long-term stable durability performance underground. The applicable targets are small-scale buildings with up to 3 stories, a height of up to 13m, and a total floor area of up to 1,500 square meters (for single-story buildings, up to 3,000 square meters). The types of ground that can be designed for are cohesive soil and sandy soil, with a maximum construction depth of up to 14m. The foundation types can accommodate either strip foundations or slab foundations.

Price information

 

Delivery Time

Model number/Brand name

Ground reinforcement work

Applications/Examples of results

It is mainly used in new construction projects such as wooden single-family homes and low-rise apartments where ground reinforcement is required. It is suitable for sites along narrow roads where large vehicles for soil removal cannot access, especially when there is a desire to reduce disposal costs for construction waste generated by cement-based improvement methods. It is also utilized in new construction projects in quiet residential areas where low noise and low vibration construction are required, as well as in reinforcement work on sites closely adjacent to boundary retaining walls. Since no curing period is needed and foundation work can begin immediately after pouring, it is highly effective in construction projects aiming to shorten the construction period.

Ground reinforcement work | Completely eliminate the disposal costs of construction leftover soil with no excavation! Environmentally friendly ground reinforcement RES-P method with low noise and low vibration | Geotech

TECHNICAL

Acquisition of performance certification for ground reinforcement construction "RES-P method" | Piled raft foundation method that prevents settlement through the combined action of small-diameter steel pipes and the ground | Geotec Co., Ltd.

PRODUCT

Distributors