ジオテック Official site

Wooden apartment demolition site | Rapid settlement analysis of uneven ground

Immediate analysis of settlement risks at demolition sites. A ground survey service that enables early construction of wooden apartment buildings and shortens construction periods.

We quickly assess the risk of uneven ground at the demolition site of a wooden apartment building, enabling early construction start and shortening the construction period. We prevent delays in judgment caused by inadequate backfilling and variations in geological layers by obtaining precise data through fully automated screw weight penetration tests (SWS tests). Our dedicated system immediately executes numerical comparisons and deformation angle simulations, allowing specialists to clarify the risk of differential settlement. We present an optimal reinforcement plan that eliminates excessive improvements, preventing design revisions and construction delays. We strongly support the smooth advancement of the project and adherence to the schedule.

Related Link - https://www.jiban.co.jp/service/survey/boring.htm

basic information

This measurement system consists of a highly efficient measurement framework centered around a fully automatic Swedish sounding (SWS) testing machine. In addition to automatic recording of load (up to 1.00 kN) and rotation speed, it is equipped with a real-time transmission and reception function for rod rotation resistance data. With a high-speed analysis module incorporating the Inada method for converting N values (for cohesive and granular soils), it allows for immediate calculation of allowable bearing capacity from field data reception. Furthermore, it features a judgment algorithm with three evaluation items and eight elements to assess soil strength, shrinkage, and deformation, enabling the output of electronic data-based investigation reports in a short period.

Price range

Delivery Time

Model number/Brand name

Boring survey

Applications/Examples of results

This is primarily utilized in new construction projects on the sites of demolished wooden apartments, where business speed and construction schedules are the top priority. It is ideal for residential builders and real estate developers who want to obtain reliable ground evaluations in a short time, with a brief period between the completion of demolition work and the start of new construction. It is introduced to prevent design changes and delays in confirmation applications due to delays in assessing uneven ground, and is used as a basis for rapid foundation specification selection (such as determining slab foundations, surface improvements, and column improvements). It broadly contributes to development projects that aim to achieve rapid decision-making and tight schedule management.

Ground investigation | Rapid settlement analysis method for uneven ground at the site of a wooden apartment demolition, strongly supporting optimal foundation design to shorten construction time | Geotech

TECHNICAL

Ground Investigation | Optimal Foundation Design Based on Measurement Methods for Uneven Ground Settlement Risk and Data Comparison Analysis Between Measurement Points at the Site of a Demolished Wooden Apartment | Geotech

TECHNICAL

Distributors