ジオテック Official site

Optimization of Pile Length for Narrow Sites | Comparison of Small Machine Sounding and Surrounding Data

For small steel frame buildings. By conducting small-scale soundings and cross-referencing with nearby data, we eliminate pile driving risks and identify the optimal pile length.

In urban areas and on small sites, the difficulty of transporting large equipment can lead to a lack of support layer data and concerns regarding pile construction. GeoTech's solution utilizes a highly mobile, compact self-propelled automatic ram sounding testing machine to quickly execute high-precision ground measurements in a space-saving manner. Furthermore, by correlating with our own database of surrounding boring records in real-time, we can accurately determine the inclination and continuity of support layers that may be overlooked in standalone investigations. This helps prevent issues such as insufficient pile length or excessive design, and supports the selection of optimal steel pipe piles and certified construction methods. By eliminating rework and significantly improving site efficiency, we strongly support safe and planned construction management, accompanying the project smoothly to completion.

Related Link - https://www.jiban.co.jp/service/survey/boring.htm

basic information

The machine is a small automatic penetration device equipped with self-propelled truck legs, capable of operating in narrow spaces with a transport route width of 1.5m or more and a working height of 3.0m or more. It continuously drops a 63.5kg hammer from a height of 500mm onto a rod fitted with a cone with a 90-degree tip angle and an outer diameter of 45mm, automatically recording the number of impacts (Nd value) at intervals of 200mm up to a depth of 30m. It includes an automatic torque measurement function to reduce surface friction, and the measurement data is instantly converted to CSV format on-site. It also has a high-precision conversion processing function for neighboring boring N values.

Price range

Delivery Time

Model number/Brand name

Boring survey

Applications/Examples of results

It is utilized in the construction management practices of new steel frame buildings, apartment construction, and renovation work carried out in densely populated urban areas and commercial districts. It is particularly effective for pile foundation construction plans at sites along narrow roads where large vehicles are prohibited from entering, as well as at demolition sites where underground obstacles are a concern. Additionally, it is optimal for setting concrete placement management values on construction sites, final checks of embedment depth, and reducing the labor involved in handling excess piles, thereby ensuring uniform construction quality and managing costs and timelines by construction agents and site supervisors.

Site Investigation | A construction support solution that prevents piling troubles and optimizes pile length for small steel buildings through comparison of neighboring data and on-site surveys | Geotech

TECHNICAL

Ground investigation | Preventing excessive design in the construction of small steel buildings by optimizing pile length through comparison of neighboring data and on-site detailed surveys | Geotech

TECHNICAL

Distributors