In operation, suitable for narrow spaces | Soil investigation with a compact machine | Geotech
In operation, construction can be done even in narrow spaces. Through independent investigations by the buyer using small machinery, we accurately identify soil contamination risks before the contract.
In conclusion, it is possible to accurately assess contamination before demolition, even in operating factories and narrow urban areas. There is no need to wait for the land to be cleared, which accelerates the decision-making process for buyers. First, through a historical investigation by the buyer, we identify past machine placements and hazardous material pits to narrow down contaminated areas. Next, we conduct a voluntary Phase 2 sampling survey using our own ultra-compact, simple drilling machines, which do not interfere with operations even in low ceilings and narrow corridors. This is a unique solution that allows for the understanding of underground risks while leaving the building intact, tailored to site constraints.
basic information
This is a highly mobile and advanced engineering survey specification specialized for confined and low-ceiling sites. In the sampling process, we use a simple mechanical boring machine and a portable soil gas extraction device that can be brought in with a total width of just a few dozen centimeters, minimizing floor perforation while ensuring reliable soil sampling at depths of several meters. The collected samples are transported to the lab with cross-contamination prevention measures in place, and analyses are conducted based on official methods, issuing measurement certificates with high accuracy equivalent to standard surveys, even in confined spaces.
Price information
-
Price range
P3
Delivery Time
P4
Model number/Brand name
Soil contamination investigation
Applications/Examples of results
It will be introduced in the due diligence of corporate M&A when acquiring real estate through existing factories, existing buildings, gas stations, printing companies, etc., in urban areas, or while keeping factories operational. Developers and investors who want to quantify underground environmental liabilities in advance without demolishing buildings, as well as managers who want to prevent the expansion of contamination at their operational sites, utilize it as an essential practical tool for estimating demolition costs and purification measures in advance, as well as for making purchasing decisions before sales contracts.
catalog(3)
Download All Catalogs