ジオテック Official site

Geotech | Designated Survey Institution | Comprehensive Delay Prevention for Factory Reconstruction

Prevent delays in construction and demolition during factory rebuilding. Comprehensive support from usage history investigation to soil gas analysis and confirmation of contamination range.

In the case of factory dismantling and rebuilding due to operational suspension, interruptions in excavation caused by soil contamination can lead to enormous penalties and critical risks of schedule delays. This service completely visualizes underground contamination before construction begins and provides a technical practical package to adhere to the construction schedule. In Phase 1, we scrutinize the history of manufacturing line and equipment updates and precisely extract contaminated areas. In Phase 2, as a measure against Class 1 specific hazardous substances, we conduct high-precision soil gas analysis and surface soil sampling to scientifically identify the contamination situation. If contamination is confirmed, we will determine the exact range through detailed depth drilling and develop an efficient removal and purification plan. With reliable evidence from designated investigation agencies, we will strictly adhere to the schedule and thoroughly optimize project costs.

Related Link - https://www.jiban.co.jp/service/env/index.htm

basic information

This preliminary comprehensive survey is a technical specification fully compliant with the Soil Contamination Countermeasures Act, seamlessly linked to the demolition and construction processes. In Phase 1, the historical review will thoroughly verify factory operation drawings, specific facility notification documents, and the locations of drainage pits. In Phase 2, the overview survey will utilize portable sampling equipment that can be operated even within active buildings to quickly conduct soil gas analysis for harmful volatile organic compounds. In Phase 3, the detailed boring specifications will involve core sampling to the maximum depth, determining the three-dimensional extent of contamination such as heavy metals, and rapidly delivering detailed three-dimensional contamination maps and cross-sectional data using CAD.

Price information

 

Price range

P3

Delivery Time

P4

Model number/Brand name

Soil contamination survey

Applications/Examples of results

It will be utilized in the preliminary planning stages for the reconstruction of aging manufacturing factories, the removal of production lines, the demolition of buildings in chemical plants and plating factories, as well as the construction of new commercial buildings and condominiums on the site. By identifying all environmental risks from historical land use to determining the extent of contamination before the start of architectural design and civil engineering work, it prevents work stoppages due to sudden soil contamination discoveries during construction. This is an essential process to gather objective evidence early for submitting reports to the relevant authorities, applying for development permits, and providing safe excavation and removal instructions to contractors, ensuring a smooth construction progress without any delays.

Designated Investigation Agency | Soil Contamination Survey | Comprehensive Pre-Investigation Process to Prevent Sudden Construction Delay Risks Associated with Factory Building Demolition or Reconstruction | Geotech

TECHNICAL

Soil Contamination Survey and Historical Investigation Brochure for Real Estate Companies

PRODUCT

Distributors