Automobile maintenance factory | Early soil contamination survey during operation (designated survey organization)
Avoiding the risk of construction delays during rebuilding or decommissioning. We provide early investigations to proactively identify soil contamination around facilities while operations continue.
This is an early soil contamination survey package designed for operating automobile maintenance factories, which visualizes potential risks on-site without halting operations. It addresses concerns about the infiltration of solvents such as trichloroethylene, lead from soldering and anti-corrosion processes, hexavalent chromium, cadmium, boron, and fluorine from aging pipes and pits, preventing unexpected costs and delays during rebuilding. As a Ministry of the Environment designated investigation agency, we provide comprehensive support from historical site verification to fully electric simple mechanical boring using the SCSC method (zero exhaust emissions), depth-specific boring, and rapid public analysis of residual soil, aiding in planned risk management and cost reduction.
basic information
This survey specification is composed of advanced equipment and technology specifications that minimize the impact on factory operations to the utmost extent. Even in pits with constraints on indoor workspaces and ceiling heights, we use a completely electric, easy-to-move and install, zero-emission simple mechanical boring machine (SCSC method) to conduct rapid sample collection while keeping noise and vibration to a minimum. It is capable of high-precision soil gas sampling in Phase 2 and continuous vertical core sampling up to a maximum depth of 10 meters in Phase 3. The collected soil and groundwater samples are analyzed with high precision in our own laboratory, which is a registered measurement certification facility, in accordance with the official methods stipulated by the Ministry of the Environment, providing reliable evidence data quickly.
Price information
Price range
P3
Delivery Time
P4
Model number/Brand name
Soil contamination investigation
Applications/Examples of results
The main purpose is to inventory the environmental liabilities of aging infrastructure in operating automobile maintenance factories and to conduct preliminary soil risk assessments for factory reconstruction plans while continuing operations. It will be utilized to understand and manage the presence of contamination in advance, in preparation for the submission of notifications for the abolition of specific facilities using designated harmful substances (Article 3 of the Water Pollution Prevention Act) and for partial changes in land characteristics on-site (Article 4 of the Act; development notifications for areas of 900 square meters or more). Additionally, based on the annual business plan, it can be widely applied to obtain basic data for incorporating cost-effective in-situ bioremediation and solidification methods while operating, as well as for pre-shipment lot official analysis of excavated soil generated during reconstruction in compliance with local soil regulations in various prefectures (such as Chiba and Saitama).
catalog(2)
Download All Catalogs